Close
Close
Facebook Instagram Youtube LinkedIn Twitter
Whatever you do, work heartily, as for the Lord and not for men, knowing that from the Lord you will receive the inheritance as your reward.

Colossians 3:23-24

Profile Photo: Kraig Warnemuende, Ph.D., P.E.

Kraig
Warnemuende, Ph.D., P.E.

Phone: 903.233.3965
Email: KraigWarnemuende@letu.edu

  • Assistant Professor, Civil and Environmental Engineering



Education

Ph.D. Civil Engineering, Wayne State University, 2006

M.S. Civil Engineering – Mechanical Engineering Minor, Wayne State University, 2001

B.S. Civil Engineering – Structural Concentration, Wayne State University, 1998


Experience

2014-2016

Instituto Tecnologico y de Estudios Superiores de Monterrey
Visiting Professor of Civil Engineering

2004-2014

NTH Consultants, Ltd., Northville, MI
Senior Project Engineer

1999-2004

Wayne State University, Detroit, MI
Teaching Assistant, Research Assistant, Lab Supervisor

1994-1998

G. Druce and Associates, Plymouth, MI
Welder-Fabricator, Decorative and Industrial Metal Working


Courses Taught

  • CVGR 2113 – Introduction to Surveying
  • CVGR 3224 – Design of Steel Structures
  • CVGR 3414 – Geotechnical Engineering
  • CVGR 3713 – Construction Engineering
  • CVGR 4314 – Concrete Construction and Design
  • ENGR 4813/4823 – Senior Design
  • MEGR 3323 – Mechanics of Materials

Advising & Sponsoring

  • Additive Construction Manufacturing Experimentation – Undergraduate research primarily focused on consumable materials for construction scale 3-D printing.

Research Interests

  • Research, and development of automated construction and construction materials
  • Research, development and evaluation of cementitious and composite materials
  • Design and rehabilitation using non-standard materials

Selected Publications

  • Warnemuende, K. “Amplitude Modulated Acousto-Ultrasonic Nondestructive Testing: Damage Evaluation in Concrete”, PhD Thesis, Wayne State University, 2006
  • Warnemuende, K. (presenter) and Wu, H.C. “High-sensitivity NDE in concrete: enhancement of energy dispersion using acoustic perturbation” Health Monitoring and Smart Nondestructive Evaluation of Structural and Biological Systems III; Tribikram Kundu; Ed. Proc. SPIE Vol. 5394, p. 127-138, Jul 2004
  • Warnemuende, K. and Wu, H.C. “Actively modulated acoustic nondestructive evaluation of concrete” Cement and concrete research Vol. 34(4): 563-70, 2004
  • Wu, H.C, Warnemuende, K., Yan, A., Mu, B. “Strategic sensor locations of FPR bridge decks” Smart Nondestructive Evaluation and Health Monitoring of Structural and Biological Systems II; Tribikram Kundu; Ed. Proc. SPIE Vol. 5047, p. 34-42, Aug 2003
  • Wu, H.C. and Warnemuende, K. “Effect of Cracks on Nonlinear Acoustic Signals” Revue des Systèmes série Instrumentation - Mesure et Métrologie: Ultrasonic Methods for Material Characterization Vol. 3(3-4): 181-211, 2003
  • Wu, H.C., Mu, B. and Warnemuende, K. “Failure analysis of FRP sandwich bus panels by finite element method” Composites Part B-Engineering Vol. 34(1): p. 51-8, 2003
  • Wu, H.C. and Warnemuende, K. “Nonlinear active wave modulation approach for evaluating bond conditions between adhesively bonded FRP sheet/concrete substrate” Smart Nondestructive Evaluation for Health Monitoring of Structural and Biological Systems, Tribikram Kundu; Ed. Proc. of SPIE Vol. 4702, p. 222-30, Jun 2002
  • Wu, H.C. and Warnemuende, K. “Nonlinear active wave modulation approach for microdamage detection” Advanced Nondestructive Evaluation for Structural and Biological Health Monitoring, Tribikram Kundu; Ed. Proc. of SPIE Vol. 4335, p. 221-7, Jul 2001
  • Wu, H.C. and Warnemuende, K. “Nonlinear acoustic nondestructive testing for concrete durability”, Nondestructive Evaluation of Highways, Utilities, and Pipelines IV; A. Emin Aktan, Stephen R. Gosselin; Eds. Proc. of SPIE Vol. 3995, p. 501-507, Jun 2000

Selected Design & Engineering Projects

  • Cobo Arena Demolition and Redevelopment, Demolition and reconstruction sequencing, 2014, (received ACEC of Michigan’s Eminent Conceptor Award, 2015), Detroit, MI, Design lead
  • Oakland Macomb Interceptor Drain, SRF Segment 3 Repairs, 2013, Oakland and Macomb Counties, MI (Est. $60M): Structural Design of Rehabilitation
  • Oakwood Sewer, Detroit Water And Sewerage Department, 2012, Detroit, MI: Tunnel Structural Design – 13-ft Reinforced Concrete Segmental Tunnel Liner in shallow soft clays.
  • The Edison Company, Trenton Power Plant Main Entrance Bridge Replacement, 2011, Trenton, MI (Est. $1.8M): Design Lead
  • National Science Foundation, Small Business Innovation Research Phase I, Next Generation Green Cement Technology, 2011, Principal Investigator
  • Oakland Macomb Interceptor Drain, SRF Segment 2 Repairs, Oakland and Macomb Counties, 2010, MI (Est. $50M): Design Lead
  • Black River Storage Tunnel, City of Lorain, 2010, OH (Est. $50M): Structural Design Lead
  • Oakland Macomb Interceptor Drain, SRF Segment 1 Repairs, 2009, Oakland and Macomb Counties, MI (Est. $50M): Structural Design Lead, Construction Submittal Review – Structural Lead
  • Dearborn CSO Control Project, Phase B, CSO 004&005 Facilities, 2008, Dearborn, MI (Est. $38M): Structural Design Lead, Design Review
  • Michigan Department of Transportation bridge replacement project, C01 of 82051, US-24 over Smith Creek in Brownstown, 2008, MI (Est. $400k): Design Lead
  • Wal-Mart Store #2073-06, 66” Sanitary Sewer Relocation, 2007, Brooklyn, OH (Est. $52M): Structural Design Lead
  • North Eastern Ohio Regional Sewer District, Columbus Road Emergency Pump Station, 2007, Cleveland, OH: Structural Design
  • Dearborn CSO Control Project, Phase B, CSO 006&007 Facilities, 2006, Dearborn, MI ($35M) Structural Design, Geotechnical Instrumentation Support, Construction Submittal Review – Structural Lead
  • Dearborn CSO Control Project, Phase B, CSO 008&009 Facilities, 2006, Dearborn, MI ($42M): Structural Design, Geotechnical Instrumentation Support, Construction Submittal Review – Structural Lead
  • East Dearborn CSO Control Project, CSO 017 Facilities, 2005, Dearborn, MI ($28M): Structural Design Review, Geotechnical Instrumentation, Construction Submittal Review
  • East Dearborn CSO Control Project, CSO 016 Facilities, 2005, Dearborn, MI ($24M): Structural Design Review, Geotechnical Instrumentation, Construction Submittal Review
  • Dearborn CSO Control Project, Phase A, CSO 012 - 015 Facilities, 2005, Dearborn, MI ($42M): Geotechnical Instrumentation, Construction Submittal Review
  •